LASER 260

+ + + Newsticker + + +

First flight done, June 6th 2009 ...

To have a look to the video of the flight, please click here
last update: 09.06.2009
+ + +

Paint Scheme        Construction log         My Helpers 

. Catagory Item description Status
1   Wing
 

1.1 Wing painting Painting of complete wing  done 
1.2 Wing assembly assembly of wing with ailerons   done
 
 

2   Fuselage

2.1 Fuselage Frame Basic fuselage frame done
2.2 Wing Attachements Main and rear spar attachements  done

2.3 Main Gear Main Landing gear incl. Wheel pants painting done
2.4 Tailwheel Tailwheel assembly
done

2.5 Rudder Pedals Ruder pedal assembly done
2.6 Flight Control System Flight Control system assembly done
2.7 Elevator arms &tubes Elevator idler arm assembly incl. tourque tubes done
2.8 Seat Seat assembly done
2.9 Stringers Stringer assembly done
2.10 Covers Fuselage covers incl. Lexan floors + painting done
2.11 Trim system Trim system assembly done
2.12 Rudder system  Rudder system assembly done
2.13 Aileron System Aileron system assembly done
2.14 Elevator System
Elevator system assembly 






3   Tail done
3.1 Trim Tabs Trim tabs (left & right) done
3.2 Elevator stabs Elevator stabs (left & right) done
3.3 Elevators Elevators and trim tabs incl. Mounting done
3.4 Vertical Stab Vertical stabilizer done
3.5 Rudder Rudder incl. Mounting done
3.6 Hinges Rudder & Elev Hinges      done

3.7 Component covering Covering of all tail surfaces  done
 
 

4   Firewall Forward

4.1 Engine Mount Nacharbeiten, Lackieren, Installieren done
4.2 Firewall Firewall assembly done
4.3 Cowling Cowling rework, assembly + painting done
4.4 Engine Installation Engine installation incl. Accessories done
 
 

5   Accessories

5.1 Fuel tank Fuel tank incl. Aux tank assembly done
5.2 Panel Instrument panel done
5.3 Electrical system Electrical system installation done
5.4 Canopy
Canopy incl. installation  done
5.5 Heating System
Heating & Ventilation System incl. installation  done