LASER 260

- Component covering -

Fuselage after powder coating

Preparation of componets for covering ...
riveting of floating anchor nuts to elevator stabs
(left & right)

riveting of floating anchor nuts to elevator (left & right) for trim tab mounting

riveting of floating anchor nuts to rudder for trim tab mounting

riveting of floating anchor nuts to vertical stab and fuselage brackets

riveting of floating anchor nuts to bottom rear stringer

bolting elev stab fuselage attachment tube with AN4 bolts to fuselage

fuselage with mounted side & bottom wood stringer, ready to cover with ceconite

... and moved to different location with final attached gear

fuselage partly skinned

inside back view

inside front view

ready covered rudder

elevator ready covered (left / right)

elevator stabs ready covered
(left / right)

preparation of elevator
metal access hole frame
s

drilling holes and riveting floating anchor nuts to frame

screwing frame (left / right) on fuselage; ready for skinning the tail section

riveting of floating anchor nuts for turtle deck mounting to fuselage

skinning of rudder fin

... close view of tail section

cable fairings reday for installation ;o)

cable fairings installed and drilled to accept rudder cable

total view of tail section with installed turtle deck

to be continued ...

  HOME